搜索
搜索
News
news information
您现在的位置:
Homepage
-
-
-
"Breaking the game and chip shortage": Keyi Power opens the advanced road of BMS localization

"Breaking the game and chip shortage": Keyi Power opens the advanced road of BMS localization

  • Categories:Company News
  • Author:
  • Origin:
  • Time of issue:2021-05-24
  • Views:0

(Summary description)90 days of hard work, 8 test vehicles, 18,000 company road tests, and a full set of DV experimental tests—with the successful mass production of the localized chip version of BMS, it marks the prelude to the advanced road of localization of Keyi Power’s BMS. In the next three months, Keyi Power will go one step further and realize the full localization of the hardware and software development environment.

"Breaking the game and chip shortage": Keyi Power opens the advanced road of BMS localization

(Summary description)90 days of hard work, 8 test vehicles, 18,000 company road tests, and a full set of DV experimental tests—with the successful mass production of the localized chip version of BMS, it marks the prelude to the advanced road of localization of Keyi Power’s BMS. In the next three months, Keyi Power will go one step further and realize the full localization of the hardware and software development environment.

  • Categories:Company News
  • Author:
  • Origin:
  • Time of issue:2021-05-24
  • Views:0
Information

The global chip supply is ushering in a "chip shortage", and as consumer demand rebounds from the bottom of the new crown pneumonia (COVID-19) epidemic crisis, many car and electronic device manufacturers have warned of a wave of global chip shortages. This problem has caused delays in the production schedule.

On March 26, NIO announced that due to a shortage of chips, it had decided to suspend production at the Jianghuai Automobile Plant in Hefei for five days from March 29. In addition to Weilai, many automakers such as Ford, GM, Honda, and Volkswagen have also suffered from production shutdowns due to chip shortages. In the domestic market, the automotive field that needs to use a large number of chips faces a long-term reduction or even suspension of production - the automotive chip crisis broke out.

 

Change! Keyi Power uses "China Core"

In December 2020, Keyi Power "was ordered in danger"-customized development of "China Core" battery management system for customers, supporting self-developed battery packs, ensuring continuous supply from customers and helping the sustainable development of the domestic new energy market.

 

Research! 90 days of hard work, 8 test vehicles, 18,000 company road tests, a full set of DV experimental tests

On December 20th, Keyi Power established the "BMS Localization Research Team", R&D and procurement quickly determined the optional domestic chip manufacturers and models, procurement was responsible for signing supply guarantee agreements with manufacturers, and R&D was responsible for the performance evaluation of domestic performance. On January 11, the chip selection was finalized.

The research team exerted its continuous combat capability, completed the hardware design on January 15, welded the BMS circuit board of the domestic chip on January 19, and delivered it to the software engineer for software development. After 19 days of software development and testing, the BMS real-vehicle joint commissioning of domestic chips was finally completed before the Lunar New Year in 2021, enabling the vehicle to operate without faults.

After the Spring Festival, Keyi Power quickly set up a road test team of 8 vehicles to conduct road test tests under various working conditions. Beijing R&D has carried out a strict full set of DV tests on domestic chips in terms of electrical, temperature, mechanical vibration, EMC, sleep wake-up, CAN communication, etc. The test team at the customer's office cooperates with the customer to carry out the vehicle calibration test and the 18,000-kilometer road test test. Keyi Power Suzhou Electronics Co., Ltd. has carried out the production line design and trial production of domestic chip version controllers.

On March 15th, the team officially completed all internal and customer verifications, and on March 22nd, it obtained the customer's OTS license. At the end of March, Keyi Power's domestic chip version BMS was officially mass-produced, realizing seamless switching between imported chips and domestic chips, effectively ensuring the continuous supply of customer products.

After 90 days of scientific research, 8 test vehicles, 18,000 kilometers of road tests, and a full set of DV tests passed, Keyi Power has also completed a challenge to itself while standing the test of the market.

Prelude! The advanced road of localization of Keyi Power

With the successful mass production of the localized chip version of BMS, it marks the prelude to the advanced road of localization of Keyi Power's BMS. In the next three months, Keyi Power will go one step further and realize the full localization of the hardware and software development environment.

Scan the QR code to read on your phone

Recommended news

Key Power was awarded the Beijing Specialized Special New Little Giant Enterprise
Specialized, refined, and new SMEs refer to SMEs that have outstanding capabilities for specialization, refinement, and characteristic innovation. The "Little Giant" enterprise is the leader among them, and it is a pioneer enterprise focusing on market segmentation, strong innovation ability, high market share, mastering key core technologies, and excellent quality and efficiency.
See more information 白箭头 黑箭头
Key Power honored with China 2021 top 100 Supplier of Key Parts for Intelligent Electric Vehicle.
On January 12, 2022, at the 8th Tramway People Conference held at Suzhou High-speed Railway Jinke Hotel, Keyi Power was elected as "2021 China's Top 100 Smart Electric Vehicle Core Components"! System category - battery pack and BMS" group top 4.
See more information 白箭头 黑箭头
The high performance power battery system installed in GSEV was launched in Beijing, which was developed for SAIC-GM-Wuling Automobile by Key Power.
Science and technology are great creative activities of human beings, and innovation is the first driving force for development! From September 25th to 28th, the new energy vehicle industry development achievement exhibition was held in Beijing. After layers of review, SAIC-GM-Wuling GSEV high-performance power battery system and Hongguang MINIEV were successfully selected for the achievement exhibition. Following the Wuling chip and smart micro-swap station, the GSEV high-performance power battery system with the largest installed capacity in China was unveiled for the first time, demonstrating the "first power" that promotes the accelerated development of China's new energy vehicles.
See more information 白箭头 黑箭头

Message consultation

Username used for comment:
Online Message
Description:
验证码

Beijing Headquarter/R & D Center: 

 

Beijing KeyPower Technologies Co., Ltd.

Address: 9B, Diantong Innovative Plaza, No. 7, Jiuxianqiao North Road, Chaoyang District, Beijing
Phone: 
400 666 4009-1(China)
Email: office@key-power.com.cn

Suzhou Manufacturing Base:

 

Suzhou KeyPower Technologies Co., Ltd.

Address: Building 17, Dongjing Industrial Workshop, Suzhou Industrial Park, Suzhou
Phone: 
400 666 4009-2 (China)
Email: Plant@key-power.com.cn

Liuzhou Manufacturing Base:


Liuzhou KeyPower Technologies Co., Ltd.

Address: Building 3, Intelligent Grid Industrial Park Phase Ⅱ, Northern Ecological New Area, Liuzhou

Phone: 400 666 4009-4 (China)

Email: PlantLZ@key-power.com.cn

Contact Us:

Key Power